SAME WORKSPACE. SMALLER YEARLY BILL.

Keep $78.
Every year.

For every team member, when you pay yearly. Every feature is still included.

12 monthly payments$468
One annual payment$390

That's $32.50 per member / month, billed yearly in USD.

See your team's annual price

14-day full-product trial. Card required. Cancel before day 15 to avoid billing. Annual savings compare $390/year with 12 payments of $39.

For design studios

Leave room to explore. Keep a clear finish line.

Keep the brief, the review record and the fee together, so every extra round is a decision.

Two designers at a studio worktable covered with colour explorations and paper packaging mockups, one pointing at a sheet while the other takes notes

Write the review rounds into the brief.

A brief that names the approver and the number of rounds turns scattered feedback into a decision. When a new direction arrives after an approval, the studio can see it for what it is.

Switch between two moments in an illustrative $8,400 identity engagement.

Try the scope creep calculator
Choose a point in the sample engagement

Brand mark exploration

Approved

PRPriya RamanApproved Version 2

Project briefTwo review rounds, feedback consolidated by Priya Raman

Contract
$8,400
Cost to date
$5,700
Margin
32.1%

NextMove into production

Brand mark exploration

Changes Requested

PRPriya RamanAsked for a new direction after approving Version 2

Project briefVersion 2 was approved. This is a change to an approved decision.

Contract
$8,400
Cost if absorbed
$6,330
Margin if absorbed
24.6%

NextAssess a change request before the extra 14 hours

Illustrative product view. Sample data.

The engagement

One project. The brief, the proof and the fee.

Exploration stays with the creative team. The brief, the current version, the feedback and the economics stay where everyone can find them.

  • The brief, pinned

    Audience, outcome, deliverables, review rounds and the approver in one current document.

  • Stages the team can see

    A board for moving work, a list for detail, a calendar for dated commitments.

  • Feedback on the image

    Numbered pins point at the exact area. PDFs open in an embedded view.

  • A recognizable version

    Each round is a new version of the same proof, with its decision recorded.

  • The fee against the effort

    Contract, cost to date and direct margin on the fixed fee.

  • Clients comment where you share

    Clients give feedback on the tasks you share through the portal.

The four tools a studio leans on.

Clear about what the studio decides.

What Flowboard keeps

  • The brief, versions and image feedback on one project.
  • Whether the current version is approved or needs changes.
  • The fixed fee against logged time and direct costs.
  • The people each stage needs, planned week by week.

What stays with the studio

  • Judging whether an idea is good.
  • Design software, asset tools and font licensing.
  • Frame-accurate video review. Keep a specialist tool for that.
  • Closing the whole project on one approved proof.

Keep contractual acceptance distinct from an internal creative decision. Get the project brief template ↗

The details.

Everything above, in depth. Open what you need.

Write the review process into the brief

A useful design brief explains the audience, intended outcome, deliverables, constraints, and approval responsibilities. It should also explain how feedback will be consolidated. If several client stakeholders can independently redirect the work, the studio needs a way to turn those opinions into a coherent decision before another production round begins.

Use project documents for the current brief and lasting decisions, then organize delivery tasks around the actual design outputs. A board can show work moving through stages; a list can support detailed planning; a calendar can show dated commitments. Avoid treating a status label as a substitute for a clear definition of what is ready for review.

Keep feedback attached to a recognizable version

Proofing provides a stable record for a creative item and its versions. For image files, annotation pins let reviewers point to a particular area and explain the requested change. A new revision can then remain within the same review context, making it easier to identify which file is current and what decision remains open.

Use image pins for visual feedback, embedded PDF views for document review, and file links for other media. The internal proofing workspace and client portal have different review controls. Keep a specialist tool for review methods such as frame-accurate video comments.

An illustrative fixed-fee revision decision

Consider an $8,400 identity engagement with 110 logged hours at an average $45 labor cost and $750 of non-pass-through production expenses. Direct costs are $5,700, leaving $2,700 of direct contribution and a margin of about 32.1%. These are simplified illustrative inputs, not a studio case study.

An additional 14 hours of revisions adds $630 of labor cost. If the agreed fee remains unchanged, direct contribution becomes $2,070 and margin falls to about 24.6%. The right conversation is about the brief and agreement: is the new direction within the promised exploration, a change to an approved decision, or additional scope that needs a fee and date adjustment?

SignalEvidence to inspectDecision to make
Repeated conflicting feedbackReview comments and briefIdentify a consolidating approver
New creative directionCurrent scope and accepted decisionsAssess a change request
Senior designer overloadWeekly project allocationsRebalance timing or ownership
Extra unpriced roundsTime and direct costsReview the commercial boundary
Introduce the studio workflow on one engagement

Choose a live project with a clear scope and use it to establish the operating habit. The first goal is shared understanding, not recording every historical file.

  1. Confirm the creative agreement

    Record outputs, review rounds, client inputs, and the person who approves. Check that the proposal and working brief tell the same story.

  2. Plan the production stages

    Create tasks for exploration, production, review, revision, and handoff. Allocate the right people in the weeks they are actually needed.

  3. Use a consistent review record

    Name proofs and versions clearly, request actionable feedback, and record whether the current version is approved or needs changes.

  4. Review the remaining effort

    Compare the work left with logged time and direct costs before agreeing to additional rounds or a new direction.

Keep creative judgment with the creative team

A time record cannot measure whether an idea is good, and a margin figure cannot decide which creative direction serves the client. Use the operating data to understand constraints and choices, not as a substitute for design judgment. An apparently efficient process that avoids necessary exploration may still produce poor work.

Flowboard also does not replace design software, asset-authoring tools, font licensing, or specialist production review. Keep those systems where they belong. The connected workspace is useful for the brief, delivery plan, review context, client communication, and economics surrounding the creative work.

Inspect the proofing workflow

Understand versions, image annotations, and current media limits.

Explore this workflow ↗

Keep the fee and effort connected

Use direct margin with a realistic view of work still to come.

Explore this workflow ↗

Questions

Before the next review round.

Can clients annotate every file type?

Image pins are available in the internal proofing workspace. PDFs use an embedded view and other media can use file links. Proofs are for your team. Clients give feedback in the comments on tasks you share through the portal; use a specialist tool when the client review needs annotation controls.

How should we handle multiple client reviewers?

Define who consolidates feedback and who makes the final decision. Use the review record to keep comments attached to the right version, but make the approval responsibility explicit in the brief. Software cannot resolve contradictory creative instructions without a decision owner.

Should exploratory work be tracked?

If it is part of the engagement's delivery effort, record it under a consistent policy. Exploration has a real cost even when it does not appear as a separate client invoice line. Use the data to improve estimation and scope conversations, not to pretend creative value is measured only in hours.

Does an approved proof close the whole project?

A proof approval describes a particular review outcome. The project may still need production files, quality checks, handoff documentation, or other deliverables. Update the task plan deliberately and keep contractual acceptance distinct from an internal creative decision.

When does another revision become a scope change?

That depends on the agreement, the original brief, and what was previously approved. Review the evidence before deciding. A new direction after an accepted decision may deserve different treatment from a correction required to meet the original brief.

Start with one real project.

Good work.
Healthy margins.

Try Flowboard for 14 days ↗Card required. Every feature included.

Find your next answer.

Start typing to search the full website.