Flowboard documentation

Import a project without losing the context

Flowboard has one-time import paths for ClickUp, Asana, Trello and CSV. Prepare the destination, test a representative project and compare the result with the source before moving the wider agency. Imports transfer selected records; they do not preserve every feature of another product.

Every feature included. Card required for the trial.

Flowboard sample workspace for import a project without losing the context
Actual Flowboard interface with sample data.

01 / Flowboard documentation

Choose the right route into the workspace

ClickUp and Asana use personal API tokens for the import run. Trello and CSV use uploaded files. Create or export the source material through the source product, then use Flowboard's corresponding import path. Keep the original system available while validating the result.

Invite the relevant team members before importing. Matching works against people already in the workspace, and an unmatched assignee is left off the task rather than guessed. Use a current export or a clearly identified source project so the team can distinguish the original state from changes made after migration began.

02 / Flowboard documentation

Understand the source-specific mapping

In ClickUp, lists become projects. Tasks and up to two levels of subtasks map into tasks and child tasks. Status and priority values map to Flowboard equivalents. Space and Folder layers flatten away, and imported tasks arrive without sections.

Asana projects remain projects and sections remain sections. Completed tasks become Done. One subtask level becomes child tasks; deeper subtasks are flattened into titles with a parent prefix. ClickUp and Asana assignees match by email, then name. These are explicit mappings, not a promise that the two systems have identical structures.

SourcePrimary mappingImportant boundary
ClickUpList to project; tasks and child tasksSpace/Folder layers flatten; no imported sections
AsanaProject and sections retainedDeeper subtask hierarchy becomes title context
TrelloBoard to project; lists to sections; cards to tasksCards in closed lists are skipped
CSVRows to the chosen task, contact or project entityConfirm the field mapping before writing

03 / Flowboard documentation

Use file imports deliberately

A Trello board can become a new project or land in an existing one. Lists become sections, cards become tasks and checklists become subtasks. Members match workspace users by name. Labels and attachment links are appended to descriptions. Recognized completed-list names can set tasks to Done, while cards in a closed list are skipped.

CSV is useful when the source does not have a dedicated import wizard. Choose the entity type, inspect auto-matched headers and confirm the mapping. A column named name, title or task can map to a title field, but similar names do not guarantee that every column has the meaning intended. Test a small file containing realistic dates, empty values and unusual text.

04 / Flowboard documentation

Keep the history that does not transfer

Comments, historical time entries and custom fields do not import. Attachment references arrive as links in descriptions rather than uploaded files. That means a visually complete task list can still lack the conversation or effort history needed to explain a past decision.

Retain source exports or read access according to your agency's obligations and agreements. Move essential current decisions into an appropriate project brief or document, clearly identified as migrated context. Do not describe copied summaries as original comments or create invented time entries to make old totals appear complete.

  • Keep historical hours in the source record.
  • Verify that attachment links remain accessible.
  • Capture important current decisions in a project brief.
  • Check source-retention needs before cancelling another subscription.

05 / Flowboard documentation

Validate a representative run

For an illustrative website project, count the source tasks and sections, note the key owners, and identify one completed item, one nested item and one attachment. After importing, compare those examples and inspect the job summary. Check created counts, skipped counts and work left unassigned.

Open the error log whenever records were skipped. Row-level failures record an item and reason, up to 100 entries; beyond that the run continues without recording additional errors. A small visible error list is therefore not proof that only a small number of records failed. Use the summary counts as well as the examples.

06 / Flowboard documentation

Plan rollback and the cutover

Owners and administrators can roll back an import batch. Imported rows carry the run's batch identifier, and rollback removes records created by that batch with per-entity counts. Review the batch and its consequences before using rollback, especially if people have begun working in imported projects.

Once verified, agree when the team starts updating Flowboard as its working record. These importers do not keep synchronizing with the source tool. Parallel editing without a cutover rule creates two versions of the project. Keep an exception list for work that stays elsewhere, and explain how the team should reference it.

THE PRACTICAL DETAILS

Questions, answered.

Is this an ongoing sync?

No. These are one-time migration tools. They do not continue exchanging changes with the original product after the import.

Will historical comments and time move?

No. Comments, time entries and custom fields do not import. Retain their source records if they are needed for reporting or decision history.

Why are some tasks unassigned?

The importer does not guess when it cannot match a person. Invite the team first, then inspect unmatched assignments and correct them deliberately.

Can I undo a bad import?

An Owner or Admin can roll back the specific batch. Review its records first and coordinate with anyone who has started working in them.